Vertical cable tray elbows at the top of runs should be supported at the joint on each end.
Cable tray support span calculation.
For support spans greater than 5 feet 1 5m cable loads must be evaluated to ensure that the span between the supports is suitable for the load the support and anchor must be evaluated separately.
1 table of contents 02 section a.
Quick tray fill and load calculations anchor must be evaluated separately supports should be placed within 24 in 610mm of a splice on straight.
To join two components together clamp or fix to walls ceilings or other supports covers and cable retainers associated supports bespoke supports for cable tray and cable ladder other than bs 6946 channel.
However in practice a run must contain joints and it can also never be of infinite length so it is important to appreciate how its characteristics vary from span to span and how these.
6 cable ladder and cable tray systems including channel support systems and other associated supports definitions and abbreviations accessory component used for a supplementary function e g.
Receiving and unloading 03 section c.
Support load calculation per iec 61537 one or more spans iec 61537 7 3i.
Support of cable tray and ladder is typically done in the same fashion as us installations but generally has fewer restrictions as to loading design.
Common tools for installation 04 section d 2.
This classification is based on the working load the total weight of the cables and the support span the distance between supports.
Introduction 02 section b.
On tue dec 2 2014 at 7 52 pm electrical notes articles wrote.
Intermediate support for upper tray required on piperacks over 6096mm wide.
Calculate cable tray width calculate cable tray area calculate cable tray length calculate cable tray weight calculate remaining width of cable tray calculate remaining area of cable tray free download.
Installation of support structure 09 section d 3.
A typical multi span cable ladder or cable tray installation behaves largely as a continuous beam.
Fittings installation 23 section d 5.
Straight length installation 16 section d 4.
Ancillary products accessories.
Installation 03 section d 1.
Supports should be placed within 24 in.
Weight on support weight of span 2 cable tray maximum load in lb ft according to span catalog number 5 ft 6 ft 7 ft 8 ft 9 ft 10 ft.
Cable load working load the cable load or the working load is the total weight of the cables to be placed in the tray.
Vertical cable tray elbows at the bottom of runs should be supported at the top of the elbow and within 610mm of the joint at the bottom of the elbow.
The nema classes are based on cable loads of 50 75 and 100 per lineal foot.
Field modifications 25 section d 6.
Cable support systems in the international world iec61537 2004.